Automatically translated version. May contain inaccuracies compared to the original.
Ukrainians could be left without gas in the middle of the heating season if chimneys are not inspected in time, — investigative reporting unit (SIO)
📍A clogged chimney is a risk of fatal carbon monoxide poisoning. Before turning on heating, check the boiler, draft, and ventilation.
📍30 days for inspection. If after the established period the owner does not ensure a chimney inspection within 30 days, that is grounds for disconnecting the gas equipment.
📍How often to inspect? Gas boilers and stoves that operate only during the heating season — at least once a year before it begins. If equipment runs year-round — twice a year.
📍Gas can be shut off immediately due to danger. If lack of draft, a faulty or non-hermetic chimney is found, the equipment must be disconnected until violations are corrected.
📍Who is responsible? In private houses — the owners or other responsible persons. In apartment buildings, arranging the inspection may fall under the duties of the condominium association (OSBB) or the manager.
📍After the inspection, a DVC report must be issued. Without proper proof of inspection, problems may arise with further use of gas equipment.
Ukraine Online | Subscribe