Automatically translated version. May contain inaccuracies compared to the original.
Primary work and inspections of damaged structures continue on the Southern Bridge, — Kyiv City State Administration
As a result of an enemy strike on 27 October, elements of the bridge were damaged, including the reinforced concrete span structure, vehicle roadways, metro structures, and engineering communications.
KP “Kyiv Metro” has restored the primary cable networks for power supply, signaling, communications, and train movement between Osokorky and Chervonyi Khutir stations. Restoration of other engineering networks is ongoing.